Generator maintenance contracts: what to put in one

Updated

A generator contract is three purchases in one wrapper: planned visits, response cover and evidence. Price them separately or you cannot compare two proposals.

Get servicing quotes

The three things you are buying

Planned maintenance
Visits at agreed intervals with a defined task list, to the manufacturer's schedule on hours and calendar. This is the part that is easy to price and easy to compare, so long as the task list is attached.
Response cover
A promise about how quickly an engineer attends when the set fails or is needed. This is where prices really differ, and where the wording matters more than the number.
Evidence
Reports, readings, load test results, fuel sample results and a maintenance log kept up to date. PUWER expects the log; your insurer, auditor or client may expect more.

An annual maintenance contract for a diesel generator

An annual maintenance contract, often called an AMC, is the planned part priced for a year. It sets a number of visits to the manufacturer's schedule, each with its task list, and usually one fuller annual service.

For a diesel generator the schedule is driven by hours run as well as the calendar. A set that runs often needs more visits than a standby set that barely runs. Ask for the visit count, the tasks at each visit and the annual price, and treat response cover as a separate line.

One provider in the index, Generators AS in the South West, also publishes annual plans (Generators AS service pricing, read 30 October 2026):

  • A standby set, Service A and Service B six months apart: £495 a year up to 50kVA, £660 for 101 to 250kVA and £1,145 above 900kVA.
  • A single Service A: £265 to £825.
  • A set on prime power: serviced every 250 to 400 hours and priced per visit, from £239 a visit up to 50kVA when three or more are pre-booked.

The service level agreement: clauses worth arguing about

  • Response measured from when? From your call, not from when the engineer is dispatched, and with a defined out-of-hours route that a human answers.
  • Parts availability. A four hour response with a three week part is not cover. Ask what is held in stock for your engine.
  • What counts as covered. Whether consumables, batteries, coolant and filters are included, and whether repairs found at service are inside the contract or quoted separately.
  • Load testing and fuel work. Both are commonly excluded from the headline contract price. Decide whether you want them in, then compare on the same basis.
  • Escalation and exit. Annual uplift mechanism, notice period, and what happens to your records when you leave.

Getting comparable proposals

  1. Write a one page specification. Sets, ratings, engine and alternator makes, hours, what they protect, access constraints, and the visits and tests you want.
  2. Ask every provider to price that specification, plus a separate optional list for anything they think is missing.
  3. Ask for the standard and out-of-hours labour rates even under contract, because that is what non-contract work will cost.
  4. Ask for a sample service report. If the sample is a page of ticks with no readings, you now know what you would be filing for the next five years.

A contract does not transfer your duty. PUWER duties sit with the employer who controls the work equipment, and buying maintenance does not move them. What a good contract does is make the duty easy to discharge and easy to evidence.

Get generator servicing quotes

Two minutes of questions; generator service providers covering your site quote you directly. Free, no obligation.

Your set

Roughly what size is the set?

  • Free, no obligation
  • Your details go to at most three providers
  • Takes about two minutes

Get a price for your actual set.

Two minutes of questions; generator service providers covering your site quote you directly. Free, no obligation.

Questions, answered directly

What should a generator maintenance contract include?

A defined task list per visit against the manufacturer's schedule, and a stated response time measured from your call. Clarity on which consumables and parts are included, and whether load bank testing and fuel work are in scope. A report format with recorded readings. Get the standard and out-of-hours labour rates in writing, even under contract.

Does a maintenance contract mean the generator is legally compliant?

No contract transfers your duties. Under PUWER the employer controlling the work equipment must keep it in an efficient state, in efficient working order and in good repair. It must also keep any maintenance log up to date. A good contract makes that easy to do and to evidence, but the obligation remains yours.

How much does a generator service contract cost?

Few do: 3 of 58 UK providers we read publish a single service price, £250 to £275 (median £265, read 12 October 2026). Generators AS publishes a two-visit standby plan: £495 a year up to 50kVA, £660 for 101 to 250kVA, £1,145 above 900kVA (read 30 October 2026). Response cover, load testing and fuel work are extra.

What is a generator service level agreement?

The part of a maintenance contract setting out what the provider promises when the set fails or is needed. It covers how quickly an engineer attends, measured from your call, the out-of-hours route, the parts held for your engine and what counts as covered. Contract prices differ most here, so read its wording before the price.

Sources

This site's own datasets, every figure quoted from its source and dated:

  • The median published figure in the UK Generator Service Price Index is 265 GBP across 3 sources' own pages (range 250 to 275 GBP), read 11 November 2026.
  • The UK Standby Generator Obligations carries 8 published figures read from 3 sources' own pages; the 3 published figures given without a breakdown run from 50 to 50 hour, read 7 November 2026.
  1. HSE. Provision and Use of Work Equipment Regulations 1998 (PUWER)
  2. HSE. PUWER overview
  3. HSE. Inspection of work equipment
  4. HSE. Maintenance of work equipment